The aim was to achieve an improvement of energy efficiency in this facility, and this was made possible thanks to a better insulation.
The installation company was Inabensa, belonging to the Abengoa group.
| Year | 2014 |
|---|---|
| Owner | Cepsa |
| Engineer | Cepsa Engineering |
| Country | Spain |
| City / Region | Huelva |
| Sector | Processing |
| Segment | Petrochemicals |
| Product type | ProRox WM 960 and ProRox PS 960 |