The aim was to achieve an improvement of energy efficiency in this facility, and this was made possible thanks to a better insulation.
The installation company was Inabensa, belonging to the Abengoa group.
Year | 2014 |
---|---|
Owner | Cepsa |
Engineer | Cepsa Engineering |
Country | Spain |
City / Region | Huelva |
Sector | Processing |
Segment | Petrochemicals |
Product type | ProRox WM 960 and ProRox PS 960 |