BP Valhall Production & Hotel Facility

The $2.4 billion project was to build a new accommodation/production platform, preserving a proportion of the existing infrastructure which was pending eventual decommissioning and to stop reservoir subsidence in order to extend field life to 2049. The new production and hotel platform - has a design life of 40 years. It is sized for production of about 120,000 barrels of oil and 143 million cubic feet of gas per day. The newly developed facilities, including a manned platform, are expected to build up to the production to around 65,000 barrels of oil equivalent per day in the second half of 2013.

Year 2010
Owner BG Norge
Engineer Mustang Engineering
Construction contractor SLP Engineering
Insulation Contractor Kaefer C&D
Country United Kingdom
Sector Offshore
Segment Fixed Platform
Application Deckhead, Bulkhead and Firewalls
Product type SeaRox SL 620UK