It gets the sulphur out of a mine in Osiek. For a good and stable operation of the mine they needed a new heating pipeline connection with the Połaniec power plant. ROCKWOOL TECHNICAL INSULATION insulated this heating pipeline with ProRox PS 960 pipe sections in a total length of more than 12 km.
| Year | 2012 |
|---|---|
| Owner | KIZCHS Siarkopol S.A., Grzybów, 28-200 Staszów |
| Engineer | Kaefer Oddział Tarnów |
| Country | Poland |
| City / Region | South- East Poland |
| Sector | Power Generation |
| Segment | Conventional Power Generation |
| Application | Pipeline |
| Product type | ProRox PS 960 |